BASEMENT RENOVATION / HILLSBORO, OREGON

A new life downstairs in Hillsboro.

A complete basement transformation with a primary bedroom suite, two full bathrooms, a large living and games area, an office and a utility room—supported by new framing, electrical and plumbing work.

Finished Hillsboro basement living and recreation area
Hillsboro, Oregon · Actual project photography

THE PROJECT

Basement Renovation

For this Hillsboro homeowner, we created a new layout across the basement. New framing defined a primary bedroom with its own full bathroom and walk-in closet, a second full bathroom, a utility room, a dedicated office and a large living room with space for games. The work also went below the floor and through the concrete walls: new plumbing routes, new window openings and a relocated water heater were part of the transformation.

FROM START TO FINISH

The story behind
the space.

01

A new layout for the lower level

We framed the basement to create distinct private, shared and service areas. The primary bedroom received its own full bathroom and walk-in closet. A separate full bathroom serves the other basement spaces, while the office and utility room have their own defined areas. The larger shared room accommodates both everyday living and a games area.

02

Concrete work and new windows

We broke out sections of concrete to form openings for new side-opening casement windows, with exterior window wells to address basement egress requirements. This work connected the new interior layout with the necessary window openings outside.

03

New electrical and plumbing infrastructure

The basement received a new electrical installation. We also broke out sections of the concrete floor so new plumbing could be installed for the revised layout. The water heater was moved to a new location as part of the utility work.

04

Finishing the rooms

The finished collection shows the living and recreation areas, bedroom and storage, along with the bathrooms. Vanity cabinetry, shower glass, tiled walls, mosaic shower floors, floor transitions and lighting provide close views of the finish work that followed the framing and installation stages.

Finished bathroom — wide vanity, shower and tile floor — Basement Renovation, Hillsboro
Finished bathroom — wide vanity, shower and tile floor
Finished shower detail — rain head, niche and mosaic floor — Basement Renovation, Hillsboro, Oregon
Finished shower detail — rain head, niche and mosaic floor

A CLOSER LOOK

Details worth seeing.

Two full bathrooms

The scope includes a private bathroom for the primary bedroom and a second full bathroom. The gallery brings together bathroom layouts and closer views of vanities, tile and shower details.

Concrete and service work

The renovation required concrete removal for new window openings and underfloor plumbing, together with exterior window wells and relocation of the water heater.

Living, working and storage

The large living room and games area are supported by a separate office, utility room and a private walk-in closet in the primary suite.

THE PHOTOGRAPHIC RECORD

Explore the work.

YOUR HOME. YOUR NEXT CHAPTER.

Have a space
in mind?

Tell us about your property, the rooms you want to change and your priorities. We’ll discuss your scope and the next steps for your project.

Start a project conversation ↗
CONTINUE EXPLORING

Tigard Garage Conversion & Home Remodel

Tigard, Oregon

Read the next project story ↗